Opening Hansebad Anklam
On 27 November ’21, Mayor Galander, together with Sander ten Broek (2521 Simply Swimming), opened the beautiful swimming pool in Anklam (Germany). By a refreshing dive from the starting block and swimming to the middle of the pool, the ribbon was officially cut with scissors.
“In 2019 we started a feasibility study and now we already have such a great swimming pool. We can truly say that this was achieved in a very short period. This is the second concept built in Germany after the swimming pool in Rees.”
The construction started at the end of May and since then we have been working together with Slangen+Koenis architecten, HAB, Me-Le, Hellebrekers, Variopool and Myrtha Pools on the realization of another beautiful swimming pool in Germany.