2521 Workum

In Workum, Friesland in the Netherlands, sports complex De Rolpael was build, based on the 2521 concept. The facility is equipped with a 6 lane 25 meter pool and has a adjustable floor. Also a sports hall, bar and the changing rooms for the adjacent football club can be found in the building. The local […]

2521 Culemborg (NL)

Culemborg is the third municipality in the Netherlands where a facility was build according to the 2521 concept. This facility is the first ‘stand-alone’ pool including a 2Temp® solution, which allows to create two different water temperatures at the same time. It is equipped with a double adjustable pool floor. Exterior, the building has a […]

2521 Almere (NL)

Across from the existing top sport centre, in the green field development Olympia Kwartier a indoor sports centre based on the 2521 concept is realised. It is located in the future centre area of Almere Poort (which is part of the Amsterdam metropolitan area). Clubs for swimming, triathlon, diving and the Reddingsbrigade (Rescue team) use […]

2521 Alblasserdam (NL)

The first 2521 facility was realised in Alblasserdam. It was build within one year, to replace the existing pool Blokweer. The adjacent located sports hall was preserved. It was opened on October 11th 2014 by triple Olympic champion Pieter van den Hoogenband. The 2521 pool was build adjacent to the existing sports hall, connected by […]